The Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from May 1, 2025, to May 31, 2025, can be downloaded in .pdf here.
Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from May 1, 2025, to May 31, 2025
- Skopje
- July 2, 2025
- 1 minute