The Decision on the final selection of a candidate for Internal Job Posting 2/24 can be downloaded in .pdf here.
Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from December 1, 2024, to December 31, 2024
The Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from December 1, 2024, to December 31, 2024, can be downloaded in .pdf here.