The Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from November 1, 2025, to November 30, 2025, can be downloaded in .pdf here.
Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from November 1, 2025, to November 30, 2025
- Skopje
- January 16, 2026
- 1 minute