The Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from November 1, 2025, to November 30, 2025, can be downloaded in .pdf here.
Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from November 1, 2025, to November 30, 2025
Archives: January 2026