The Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from July 1, 2025, to July 31, 2025, can be downloaded in .pdf here.
Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from July 1, 2025, to July 31, 2025
- Skopje
- September 12, 2025
- 1 minute