Due to the renewal of the Decision for approval of the request for project implementation and the re-approval of the EIA Study (in a repeated procedure), the following link contains the Environmental Impact Assessment Study (EIA Study) for the Project: “Construction of State Road A4, Subsection 2 – Construction of a motorway from the interchange with the local road to the village of Blace (Blace interchange) to Skopje (Stenkovec interchange), km 2+000 to km 12+250.”
The public discussion will take place on August 27, 2025, at the premises of the Municipality of Chucher-Sandevo, starting at 10:00 AM.
- Detailed Design and Environmental and Social Impact Assessment for Motorway A4, Skopje – Blace, Subsection 2 – Construction of a motorway from the interchange with the local road to the village of Blace (Blace interchange) to Skopje (Stenkovec interchange), km 2+000 to km 12+250, can be downloaded here.
- Annex 3: Decision for conducting EIA (24.07.2025) can be downloaded here.
- Annex 1: Decision for approval of the Report – Subsection 1 can be downloaded here.here.
- Annex 2: Opinions from institutions can be downloaded here.
- Annex 4: Legal framework can be downloaded here.
- Annex 5: Letter of acceptance of alternatives can be downloaded here.
- Annex 6: Parameters and methods for surface water analysis can be downloaded here here.
- Annex 7: Assessment of ecological status according to WFD (Water Framework Directive) can be downloaded е here.
- Annex 8: Assessment of alternatives can be downloaded here.
- Annex 9: List of plant species can be downloaded here.
- Annex 10: List of butterfly species can be downloaded here.
- Annex 11: Climate resilience report can be downloaded here.