The Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from October 1, 2024, to October 31, 2024, can be downloaded in .pdf here.
Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from October 1, 2024, to October 31, 2024
- Skopje
- December 3, 2024
- 1 minute