The Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from September 1, 2024, to September 30, 2024, can be downloaded in .pdf here.
The Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from September 1, 2024, to September 30, 2024
- Skopje
- November 1, 2024
- 1 minute