The Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from July 1, 2024, to July 31, 2024, can be downloaded in .pdf here.
Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from July 1, 2024, to July 31, 2024
Archives: September 2024