The Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from December 1, 2025, to December 31, 2025, can be downloaded in .pdf here.
Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from December 1, 2025, to December 31, 2025
- Skopje
- February 12, 2026
- 1 minute