The Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from June 1, 2025, to June 30, 2025, can be downloaded in .pdf here.
Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from June 1, 2025, to June 30, 2025
- Skopje
- August 6, 2025
- 1 minute