The Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from November 1, 2024, to November 30, 2024, can be downloaded in .pdf here.
Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from November 1, 2024, to November 30, 2024
- Skopje
- January 2, 2025
- 1 minute