Skip to content

Lighting of interchange Vevcani

Status:

Completed

Road category:

Regional road

Project type:

Lighting and signaling

Financing type:

Own funds

Location:

Interchange between the regional road R1202 and regional road R2240

Start date of works:

July 2014

Intended completion date:

August 2014

Contract value:

1,484,000.00 MKD (VAT included)

Length:

Width:

Contractor:

Supervisor:

Project details

Length of the lighted road: about 400m. Number of 12-meters-tall lampposts installed: 9 single-arm lampposts. Number of lights installed: 9 high-pressure sodium (HPS) lamps of 250W. Electricity consumption reduction ensured by an installed dimming light system.