Continued works on lighting the toll station Gostivar

Status:

Completed

Road category:

Motorway

Project type:

Lighting and signaling

Financing type:

Own funds

Location:

MMotorway A2, section toll station Gostivar – interchange Gostivar

Start date of works:

July 2024

Intended completion date:

August 2024

Contract value:

3,223,000.00 MKD (VAT included)

Length:

Width:

Contractor:

Supervisor:

Project details

Length of the lighted road: about 900m Number of 12-meters-tall lampposts installed: 17 single-arm lampposts Number of lights installed: 17 high-pressure sodium (HPS) lamps of 250W Electricity consumption reduction ensured by an installed dimming ight system.