Skip to content

Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from November 1, 2023, to December 31, 2023

The Supervision Engineer’s Report on the progress of works on Corridors 8 and 10d for the period from November 1, 2023, to December 31, 2023, can be downloaded in .pdf here.

Share: